Weather reliant for erection
"I’m very happy with the tunnel but could not have erected it with just myself and one other, we had 3 pairs of hands. If the weather had been warmer it would have been easier to pull the cover tight. I think we did as good a job as possible in the circumstances. As the ground was so wet we built a wooden frame around the inside base, held down with 16 inch stakes buried in the ground and fixed with cable ties to the metal base frame."